Hartley House
Jason Sayer2024-11-20T13:11:53+00:00East London practice THISS Studio has reconfigured a Victorian terrace in Waltham Forest to maximise existing space and minimise carbon impact.
East London practice THISS Studio has reconfigured a Victorian terrace in Waltham Forest to maximise existing space and minimise carbon impact.
Assemble, Hopkins Architects, ECD Architects, and LOKI share their insights on the key issues hindering the transition to regenerative architecture.
As a practice identified as one to watch in the Regenerative Architecture Index, we spoke to Studio Knight Stokoe about legally recognising the environment and society as stakeholders, becoming a B Corp, circadian rhythms, being resilient, regenerative, and empathic and fostering a zero-overtime culture.
Max Fordham, Bond Bryan, Sheppard Robson and New Works share their insights on the key issues hindering the transition to regenerative architecture.
US firm Jahn has completed the Pritzker Military Archives Centre, providing the institution with a new gallery and 1,400 square metres of archival space.
Danish practice Bjarke Ingels Group has designed a new office and HQ for itself in Copenhagen’s industrial harbour.
London studio Pricegore has converted a former Victorian school in Nottingham into a collection of artist studios and galleries.
Three projects from David Chipperfield Architects (Berlin office) in Germany, Peris + Toral Arquitectes in Spain and O-office Architects in China are in the running for this year's RIBA International Prize.
Architects are getting ready to submit evidence of their CPD activities following a major shake-up by the ARB and RIBA. John Ramshaw outlines the new requirements and the consequences for non-compliance.
As a notable Front Runner to emerge from the Regenerative Architecture Index, we spoke to Studio Bark about bioregionalism, material sourcing, and integrating the work of ecologists and arboriculturalists among others into the studio’s practice.
Project Orange, AEW Architects, Mike Tuck Studio and Howells share their insights on the key issues hindering the transition to regenerative architecture.